The Project
Two additional berths were added to the existing Dalrymple Bay Coal Terminal infrastructure in parallel with the Ship-loader 3 addition. This system includes numerous conveyors with complex sequencing and spillage return systems.
Results
- System was commissioned with no impact to existing terminal production.