The Project
A new under-sea power cable and power station was commissioned for the airport and resort. This involved a complex and abrupt changeover which could not have effects on the airport or resort. The works consisted of $30 million worth of new electrical network, fuel systems and power station. The design was optimized for maximum flexibility, creating a system which was fully adaptable to all potential island electrical loading.
Results
- The entire powerhouse and all systems were commissioned and fully online with one hour with no issues during the changeover process.