The Project
The existing sand pumping system was experiencing reliability and performance issues, with the main bypass tunnel frequently clogging. This caused expensive damage and downtime to plant equipment. The system was modelled allowing a new pumping control regime to be produced and tested.
Results
- Pumping control system correctly adapted to sand conditions with no further clogging of the bypass tunnel.